Professional China Syphon Roof Drainage Outlet - Aluminum die cast pump housing – R&H

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Persisting in High high quality, Prompt Delivery, Aggressive Price, we've established long-term cooperation with clients from the two overseas and domestically and get new and old clients' superior comments for Aluminum Instrument Enclosure, Die Cast Aluminum Heatsink, Aluminum Stamping Parts, We sincerely do our greatest to supply the very best support for every one of the purchasers and businessmen.
Professional China Syphon Roof Drainage Outlet - Aluminum die cast pump housing – R&H Detail:

PRODUCT SPECIFICATION

DIAMETER 124MM*131MM*240MM
THICKNESS 4.5MM
SURFACE TREATMENT Polishing
COLOUR Aluminum natural color
MATERIAL Aluminum
TECHNOLOGY Cast Aluminum
 APPLICATION Car , Truck

PRODUCT FEATURE AND ADVANTAGE

High Flow Aluminum Water Pump

INSTALLING NEW ALUMINUM DIE CAST PUMP

1.If water pump is equipped with a steel back plate covering the impeller, check all mounting bolts and tighten as required.
2.Coat both sides of new gasket with tacky sealer and position on new water pump or engine. NOTE: If using a self curing, silicone type gasket sealer from a tube, do not apply excessive amount. Excess will be squeezed out into water pump and can plug up cooling passages.
3.Install new water pump on engine block – DO NOT FORCE PUMP ON BY STRIKING END OF SHAFT.
4.Tighten mounting bolts gradually and evenly in a staggered sequence to vehicle manufacturer’s torque specifications.
5.Turn pump shaft by hand to make sure it rotates freely.
6. Reinstall pulley, fan clutch (if equipped), fan, fan belts, and reconnect all hoses (Be sure the belts and pulleys are not off-set. If the pulley needs to be spaced forward, toward radiator, purchase shim kit 720-6129). Tighten fan belts to factory recommended tension. Tension can be checked with commercially available testers or by measuring fan belt deflection as specified in factory service manual.
7.Fill radiator and coolant recovery bottle with a correct mixture of fresh low silicate coolant and distilled water and check for leaks. Be sure to measure the amount of the coolant mixture that you have added to the system and compare it to your capacity specifications in your vehicle’s owners manual, this will make you aware of any air that is trapped in the system.
8.Purge system of air as required.
9.Install radiator cap and run engine until normal operating temperature is reached, check for leaks and water circulation. NOTE A small, temporary seepage of coolant from the “weep hole” located on the lower side of the shaft housing may occur during initial run-in period. This should stop after the seal has been allowed to “lap in”.
10.After operating temperature has been reached, shut off engine and allow to cool – NEVER REMOVE RADIATOR CAP WHILE ENGINE IS HOT. 11. Remove radiator cap (only after engine has cooled) and top off radiator and coolant recovery bottle with additional low silicate coolant and distilled water mixture.

PACKAGING & PAYMENT TERMS & SHIPPING

1.Packaging Detail:
a.clear bags inner packing, cartons outer packing, then pallet.
b.as per customer’s demand for hardware stamping parts.

2.Payment:
T/T,30% deposits advance; 70% balance before delivery.

3.Shipping :
1.FedEx/DHL/UPS/TNT for samples, Door-to-Door;
2.By Air or by Sea for batch goods, for FCL;Airport/ Port receiving;
3.Customers specifying freight forwarders or negotiable shipping methods!
Delivery Time: 3-7 days for samples; 5-25 days for batch goods.

WHY CHOOSE US

FAQS

Q:  what is the proceesing for the quote ?
 A: We can quote from your 3d formats like IGS,STP,PARASOLID etc and 2D drawings as well; quote  the price to clients after got the 2d or 3d drawings within 2 hours;

FACTORY SHOW

4


Product detail pictures:

Professional China Syphon Roof Drainage Outlet -  Aluminum die cast pump housing – R&H detail pictures

Professional China Syphon Roof Drainage Outlet -  Aluminum die cast pump housing – R&H detail pictures

Professional China Syphon Roof Drainage Outlet -  Aluminum die cast pump housing – R&H detail pictures

Professional China Syphon Roof Drainage Outlet -  Aluminum die cast pump housing – R&H detail pictures

Professional China Syphon Roof Drainage Outlet -  Aluminum die cast pump housing – R&H detail pictures


Related Product Guide:

With our excellent administration, potent technical capability and strict top quality control technique, we go on to provide our consumers with trusted quality, reasonable price ranges and fantastic providers. We intention at becoming one among your most trusted partners and earning your fulfillment for Professional China Syphon Roof Drainage Outlet - Aluminum die cast pump housing – R&H , The product will supply to all over the world, such as: kazan, Guatemala, Sri Lanka, We adopt advanced production equipment and technology, and perfect testing equipment and methods to ensure our product quality. With our high-level talents, scientific management, excellent teams, and attentive service, our merchandise are favored by domestic and foreign customers. With your support, we'll build a better tomorrow!
  • The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Claire from Romania - 2017.05.21 12:31
    The company keeps to the operation concept scientific management, high quality and efficiency primacy, customer supreme, we have always maintained business cooperation. Work with you,we feel easy!
    5 Stars By Caroline from Buenos Aires - 2017.11.11 11:41